CHICAGO, ILLINOIS
O鈥橦are Water Retention Basin
Walsh was the General Contractor for the creation of this 60-foot diameter sunken caisson pump station, concrete spillway, and an intake structure that serves to transport water from the retention pond at O鈥橦are north airfield to the nearby Willow Higgins Creek. It is part of the $6.6 Billion O鈥橦are Modernization Plan. The sunken caisson method was used to set the basin structure at a grade of 65 feet below ground level. Watch the video to view the process behind this innovative approach to the project.